Back to top

Projects

Central Storage and Warehouse

Lee Puts Its Trimble Software Technology to Work Again

A handful of Lee plumbing technicians are part of the group working on Central Storage and Warehouse Unit expansion in Franksville, WI.

View Project
Dayton Trucking | Lee Plumbing

Lee Keeps On Truckin’ with New Building in Racine

Lee Plumbing, Heating, Cooling and Electric will be busy this fall with a number of new construction projects. One of the more unique projects is for Ohio-based Dayton Freight Lines.

View Project
Lee Team Partners with Roundy’s

Lee Team Partners with Roundy’s on Kenosha Facility Expansion

As part of their recent goal to ramp up production of their proprietary line of soups, Roundy’s hired Utah-based General Contractor The Dennis Group to increase its production area.

View Project
Center for Entrepreneurship | Lee Plumbing

Lee Goes Back to School

Lee Plumbing, Heating, Cooling & Electric is part of a large team of commercial service providers working on the brand-new, $8 million Welcome Center and Center for Entrepreneurship at the University of Wisconsin-Milwaukee.

View Project
Lee and Riley Construction Partner on Recplex Addition

Lee and Riley Construction Partner on Recplex Addition

Lee Plumbing, Heating, Cooling and Electric is wrapping up a four-month project at the RecPlex, the country’s largest municipal recreation facility. To meet the needs of members, guests, tournament participants and spectators, the RecPlex is putting a restroom addition on the east side of the building.

View Project
Working on Woodman’s

Working on Woodman’s

While the Kenosha location of Woodman’s grocery store is well-known, it will soon not be the only location nearby. Woodman’s is expanding not only in Wisconsin but south into Illinois as well.

View Project
Brookside Care Center - Mechanical Rooms

Brookside Care Center

Lee Plumbing, Heating, Cooling and Electric is handling the plumbing and electric for this $20 million expansion of the Brookside Care Center in Kenosha.

View Project
Chiller Installation, Andis Company | Lee

Andis Company, Chiller Installation,

Lee Plumbing, Heating, Cooling & Electric is proud to be a long-time vendor for Andis Company.

View Project
Birchwood Foods, Kenosha, WI | Lee

SAGR Unit, Birchwood Foods

Lee Mechanical Contractors Inc. installed the first SAGR unit in Wisconsin.  This SAGR unit is located at Birchwood Foods in Kenosha. SAGR ( submerged attached growth reactor ) is a wastewater treatment program that provides ammonia removal from waste water in cold climates.   

 

View Project
Lee Team, Plumbing Project for Uline

Uline

Lee's experienced plumbers quickly completed this toilet room rough-in project at the new Uline warehouse/office building in Kenosha.

View Project
MBLC (Majestic Badger Logistics Center) | Lee

MBLC (Majestic Badger Logistics Center)

This project included work by Lee Mechanical for all of the plumbing, electrical, and mechanical process piping and the Lee Heating & Cooling team for the HVAC piping work. The Majestic Badger Logistics Center is located in Pleasant Prairie, WI. The main project was finalized in February last year with additional work performed throughout the year.

View Project
 Ad-Tech Medical, Oak Creek

Ad-Tech Medical, Oak Creek

Lee's experienced plumbers completed this in-wall plumbing job for the restrooms in the new Ad-Tech, Oak Creek facilities in quick time.

 

View Project
Lee Plumbers, Electricians at Festival Foods

Festival Foods

The Lee Team was an instrumental part of a number of projects for Festival Foods in 2016. Our team worked on the plumbing, underground plumbing and electrical systems for their locations in Janesville, Sommer’s and in Kenosha.

View Project
Lee work at the Kenosha Community Health Center

Kenosha Community Health Center

This project included in the installation of general power and lighting, a fire alarm system, temporary power and lighting, conduit stubs for tele/data,  plumbing, medical gas and site work to include site lighting, concrete pole bases and trenching with back filling. 

View Project
Lee work at the WE Energies Oak Creek Power Plant

WE Energies Oak Creek Power Plant FGD Plant Expansion

This project included plumbing, electrical and mechanical process piping. FRP, HDPE, PVC, welded carbon steel and 316 S.S.

View Project
Racine Gateway

Gateway Technical College, Boiler Replacement

This project included replacing two existing mechanical rooms and combining them into one with (4,000,000 BTU) boilers and six centrifugal pumps. This one mechanical room now serves the whole heating load for the campus. 

View Project
Lee work on St. Catherine's Hospital

St. Catherine's Hospital Vertical Expansion

This project was an approximately 100 Million Dollar project that put two floors over an existing, occupied hospital. This project was successful and came in under budget due to the teamwork between United Hospital Systems, Riley Construction and Lee Plumbing daily meetings to go over and review each sequence of events for that day as well as the near term.

View Project
Lee work at the Chrysler Engine Plant

Chrysler Engine Plant

This was an approximately 800 Million Dollar project that lasted a year and a half and included additions and renovations. Our company again met a very tight timeline by working closely with the plant and working multiple shifts. Form coolant systems, plumbing, dust collections systems, sealant lines, many types of gasses made this a special project.

View Project
Lee work on the Kenosha Medical Center Campus – Solarium

Kenosha Medical Center Campus - Solarium

This project included in the installation of light fixtures, smoke detectors, audio visual devices and a call assist system. 

View Project
Birchwood Foods, Pleasant Prairie

Birchwood Foods

The Lee Team was involved in Birchwood Farm's Waste Water Expansion Project. Pictured here is a Lee Team member setting a manhole for the structure and retaining wall.

View Project
  Lee Electricians working at the AWG food storage warehouse in Kenosha

AWG, Inc. Warehouse

Lee Electricians are working hard at the AWG food storage warehouse in Kenosha.

View Project
Evinrude Plant Sturtevant

BRP Evinrude Plant, R&D Relocate

This project included plumbing and mechanical process piping, carbon steel and 316 S.S. 

View Project
Maintenance work, Good Foods Group, Pleasant Prairie

Good Foods Group, Pleasant Prairie

The Lee Team has been fortunate to partner with a high quality food processing company such as Good Foods Group. Since the company moved to the area in 2013, Lee has provided plumbing, electric and process piping for different projects. We are currently providing ongoing maintenance support for their Pleasant Prairie facilities.

View Project
Lee work on the MRMC Outpatient Registration Station, Zion, IL

MRMC Outpatient Registration Station

This project included demo of existing light fixtures and switches, installation of new fixtures and switches, new data conduit drops, visual fire alarm devices, and fire stop penetrations through fire rated walls.

View Project
Lee work on St. Catherine’s Hospital Build-Outs

St. Catherine's Hospital Build-Outs

The following projects included lighting and power, fire alarm system, life safety system, ducts, sound and PA system, nurse call system, tele/data stubs, and demolition where needed.

2nd Floor Build-out February 2003 – September 2003 Cardiology Suite Build-out August 2008 – January 2009

View Project
Lee work at Kenosha Medical Center

Kenosha Medical Center Campus - Multiple Floor Renovation

This project scope was the renovation of multiple floors of the Palmer Wing. This included new light fixtures, wiring devices, plumbing, medical gas, distribution, branch wiring, fire alarm system, temporary power and lighting, nurse call system and demolition, all while maintaining occupied patient rooms. 

View Project
Carthage College Straz building

Carthage College STRAZ Science Building

This was an approximately 40 million addition / renovation to the science building. The building was located right next to the lake so there was limited parking and storage areas. We occupied the existing science lab. Using our 3D capabilities along with Timble for the thousands of pipe penetrations (not one missed) and a workforce-second to none, the project was a success for all.

View Project
 St Catherine's Surgical Expansion Project

St. Catherine's Hospital Surgical Expansion Project

This project was part of a huge surgical expansion for St. Catherine's. Lee Plumbing, Heating, Coooling & Electric's portion of this expansion was over $7 million. This portion of the project included in a medium voltage switchgear installation.

View Project