Froedtert & the Medical College of Wisconsin

St. Catherine’s Surgical Expansion

This project required an MEP contractor with the skill, qualifications & experience to execute the nearly 200,000 square foot project in a timely and cost-efficient manner.

Lee is proud to have built a trusted relationship with Froedtert & the Medical College of Wisconsin during the initial two-story vertical expansion of the main St. Catherine’s building. With over 40 years of MEP experience, Lee was the obvious choice for St. Catherine’s Medical Center’s surgical wing expansion. After demonstrating expertise in project management and team-focused atmosphere, Froedtert contracted Lee for their new surgical wing.

Beginning in the Spring of 2017, our team has been an integral part of every floor, including eight surgical rooms. This job is fully coordinated using building integrated modeling, which is a 3D model, as opposed to a traditional CAD or blueprint. We look physically in the 3D model to pinpoint exactly where you are and use a Trimble Robotic Total Station, a line of sight robot, to take all that information to determine a point within the building. The unit then takes those coordinates and lays them directly onto the project space with incredible accuracy, saving us and our customers hours of valuable time. We pride ourselves on being both on time & on-budget.

We are pleased to have a hand in improving access to healthcare for Southeastern Wisconsin area families through this project and are looking forward to yet another successful completion.

Lee Plumbing, Heating, Cooling & Electric: Your 1-Stop Shop.

Additional Project Photos

Medium Voltage Switchgear Yard Update
Medium Voltage Switchgear Yard Update
 St Catherine's Surgical Expansion Project
Froedtert & the Medical College  |  Lee Commercial
Froedtert & the Medical College  |  Lee Commercial
Froedtert & the Medical College  |  Lee Commercial